01 · I NEED TO SERVE NEW LOAD
Evaluate growth against the actual system.
- Capacity assessment and service conditions
- Curtailment-ready sites and a PPA with the utility
- Project-funded infrastructure and community benefits

Governed by the IDRP, Powered by i3 Power & Energy
We help utilities, investors and data center tenants plan, fund and power new infrastructure projects — with one shared plan everyone can trust.
HOW CAN WE HELP YOU?
WHAT WE DO
Power alone does not make a project ready. Neither does land, investment or tenant interest. We bring all six requirements into one plan — so every participant knows what is known, what is still open and who acts next.
WHAT DO YOU NEED?
Whether you’re planning for new load, putting capital to work or looking for power, see how i3 Infrastructure Partners can help — with one plan, one platform and one team behind every project.
01 · I NEED TO SERVE NEW LOAD
02 · I NEED TO PUT CAPITAL TO WORK
03 · I NEED POWER FOR COMPUTE
EXPLORE A SITE
One site, four ways to see it. Choose a lens, then tap a point on the site: the physical asset, how the Digital Architecture models it, what i3IQ can answer about it and how the IDRP governs it.

1 · PHYSICAL ASSETDIGITAL ARCHITECTUREASK i3IQGOVERNED BY THE IDRP
Utility capacity conditions shape the tenant deployment schedule. Effective service terms and interconnection conditions set the import and parallel-operation capability available to the site.
The model follows wholesale supply and transmission through substations, feeders and meters to site assets and loads.
“What must be confirmed before this data center can advance?”
A nearby asset or reviewed study does not establish a capacity commitment. i3IQ separates the findings that support the request from those still needed.
2 · PHYSICAL ASSETDIGITAL ARCHITECTUREASK i3IQGOVERNED BY THE IDRP
Wholesale supply reaches the site through transmission and the substation. Provider findings and approvals define what the connection can carry.
Transmission is the top of the top-down model: regional infrastructure context that every site-level decision connects back to.
“Which infrastructure conditions must be confirmed before the next capacity commitment?”
Utilities and authorized providers confirm capacity conditions; i3IQ traces which project dependencies still need provider review.
3 · PHYSICAL ASSETDIGITAL ARCHITECTUREASK i3IQGOVERNED BY THE IDRP
Where feasible, onsite resources can supply the site before utility service is available — or respond when the utility curtails imports.
Gas relationships connect fuel requirements to documented capacity, responsible providers and approvals.
“What changes if the utility curtails imports?”
The response depends on available generation, fuel delivery, battery duration and protected loads — evaluated for the same event.
4 · PHYSICAL ASSETDIGITAL ARCHITECTUREASK i3IQGOVERNED BY THE IDRP
Storage supports reserves, curtailment response and qualified grid services, while preserving the required contingency capability.
Availability, reserves, duration and service obligations are modeled so each response can be verified with metered performance.
“Can the battery contribution be sustained for the required duration?”
Usable energy, reserve requirements and protected loads are evaluated together before a response basis is accepted.
5 · PHYSICAL ASSETDIGITAL ARCHITECTUREASK i3IQGOVERNED BY THE IDRP
Tenant load ramps inform staged capacity and procurement. Critical loads set protected service and resilience requirements.
Tenant workloads connect to facility demand, deployment timing, resilience and any expressly permitted load flexibility.
“Which demand can change, when, and under whose approved service conditions?”
Critical service duties and customer operating constraints stay visible when evaluating growth or flexibility.
6 · PHYSICAL ASSETDIGITAL ARCHITECTUREASK i3IQGOVERNED BY THE IDRP
Cooling and support systems contribute to total facility demand — and to the site’s water requirements.
Water relationships connect cooling requirements to supply and discharge boundaries and responsible providers.
“Could a water constraint change our power requirement?”
Yes. A different cooling approach can change both water requirements and electrical demand, so the two are evaluated together.
7 · PHYSICAL ASSETDIGITAL ARCHITECTUREASK i3IQGOVERNED BY THE IDRP
Physical telecom routes and confirmed service options inform facility and tenant readiness.
Telecom relationships connect connectivity requirements to documented service options and responsible providers.
“Is the physical telecom route documented for this site?”
Telecom route evidence belongs in the project basis alongside power and water, because it shapes tenant readiness.
Illustrative site. Hotspot locations are approximate.
HOW IT WORKS · THE i3 PLATFORM
Every i3 project runs on the same four parts, supplied by i3 Power & Energy. Select a part to see how it works.
i3IQ helps authorized users explore evidence, compare alternatives and trace implications for capacity, resilience, cost and commercial obligations.
The i3 Digital Architecture relates electric, gas, water and telecom infrastructure to assets, tenant requirements, operating models and investment commitments.
Configured interfaces and shared data definitions connect systems and organizations. Authorized operators act within agreed limits.
THE FOUR PARTS — SELECT ONE
The i3 Digital Architecture connects infrastructure context from the top down with project evidence from the bottom up — so every participant works from the same picture of the grid, the site and the agreements.
SELECT A DOMAIN TO FOLLOW ITS CONNECTIONS
THE CONNECTED FOUNDATION
Infrastructure + assets + workloads
Models + operating evidence + agreements
01 · Electric · Gas · Water · Telecom
The model follows wholesale supply and transmission through substations, feeders and meters to site assets and loads. Gas, water and telecom relationships connect fuel, cooling and connectivity requirements to documented capacity, responsible providers and approvals.
Who decides: Utilities and authorized electric, gas, water and telecom providers
HOW IT CONNECTS
THE QUESTION IT ANSWERS
“Which infrastructure conditions must be confirmed before the next capacity commitment?”
02 · Data centers · C&I sites · Cooling · Controls
Facility systems translate infrastructure service into useful operating capability. The model connects site requirements, electrical and cooling systems, interfaces, controls and acceptance evidence to the operating envelope for each location.
Who decides: Project owners, engineering partners, commissioning teams and contracted operators
HOW IT CONNECTS
THE QUESTION IT ANSWERS
“Can the facility deliver the proposed service within its accepted design and operating limits?”
03 · PPAs · Tariffs · Tenant terms · Funding gates
Energy agreements, tariffs, tenant commitments and funding conditions define the project’s commercial obligations. The IDRP connects their assumptions to capability, while the digital record relates approved duties to performance measures and payment rules.
Who decides: Contracting counterparties, project investment authorities and capital providers
HOW IT CONNECTS
THE QUESTION IT ANSWERS
“Do the proposed operating commitments, payment terms and funding conditions remain compatible?”
04 · Generation · Batteries · UPS · Meters
Generation, battery storage, UPS and metering connect the energy plan to verifiable operating capability. Availability, fuel, reserves, duration and service obligations determine which responses can support the facility and any authorized utility service.
Who decides: Asset owners, contracted operators and authorized control personnel
HOW IT CONNECTS
THE QUESTION IT ANSWERS
“Which resources can respond while preserving the site’s required service and reserve obligations?”
05 · IT demand · Tenant ramp · Critical loads · Flexibility
Tenant workload requirements connect to facility demand, deployment timing, resilience and any expressly permitted load modulation. Critical service duties and customer operating constraints stay visible when evaluating growth or flexibility.
Who decides: Tenants, customer asset owners and authorized facility or workload operators
HOW IT CONNECTS
THE QUESTION IT ANSWERS
“Which demand can change, when, and under whose approved service conditions?”
06 · Utilities · Owners · Investors · Operators · Communities
The i3 IDRP Portal gives participants role-appropriate access to evidence, decisions and next actions. The IDRP maintains the shared governance roadmap, with each authority keeping its approvals and each partner its assigned responsibilities.
Who decides: Each approving authority and contracting party under the agreed IDRP roadmap
HOW IT CONNECTS
THE QUESTION IT ANSWERS
“Who must decide, what evidence is required, and which commitment does the decision enable?”
WHAT IT DELIVERS
i3IQ is AI decision intelligence for electric, gas, water and telecom infrastructure. Ask a question; it connects you to the evidence, the implications and the people who must review the next decision.
What must be confirmed before this data center can advance?
i3IQ is thinking
Reading the connected project record…
Start with the requested facility demand, deployment schedule and proposed service arrangement. A nearby asset or reviewed study does not establish a capacity commitment. The useful next step is to identify which findings support the request and which remain necessary.
THE IMPLICATION
An unresolved condition in electric, gas, water or telecom infrastructure can change the operating scenario, project schedule or commercial basis. Evaluate those dependencies together before the next commitment advances.
EVIDENCE TO INSPECT
STILL OPEN
NEXT DECISION
Assign each open condition to its responsible provider or engineer, reconcile the findings and prepare the coordinated basis for the next IDRP review.
Responsible reviewers: infrastructure providers, project engineers and the assigned IDRP decision owners.
What changes if the utility curtails imports?
i3IQ is thinking
Reading the connected project record…
The response depends on the agreed import condition, available generation, fuel delivery, battery duration and protected facility loads. Resource contributions must be evaluated for the same event and within the applicable service and operating conditions.
THE IMPLICATION
A balanced MW calculation can still leave fuel, duration or resilience requirements unresolved. Gas availability and usable battery energy must support the response while the facility preserves its required service and reserves.
EVIDENCE TO INSPECT
STILL OPEN
NEXT DECISION
Reconcile event assumptions with the utility, gas provider, engineers and operator before accepting the response basis or advancing an operating commitment.
Responsible reviewers: the utility, gas provider, energy engineer and authorized facility operator.
Could a water constraint change our power requirement?
i3IQ is thinking
Reading the connected project record…
Yes. A different cooling approach can change both water requirements and electrical demand. The decision basis needs the applicable water conditions and engineering assumptions before the effect on the facility load can be established.
THE IMPLICATION
The Capacity Plan, resource requirements and affected simulations may need coordinated revision. A cooling change can alter the electrical basis used for utility service, onsite resources and tenant deployment.
EVIDENCE TO INSPECT
STILL OPEN
NEXT DECISION
Obtain the water-provider and mechanical-engineer findings, update the assumptions and review the revised capacity and operating basis through the IDRP.
Responsible reviewers: the water provider, mechanical and electrical engineers, utility and project decision owners.
i3 IDRP · INTEGRATED DISTRIBUTED RESOURCE PLAN
The i3 IDRP is one living project record. It connects requirements, resource options, evidence, responsibilities and decisions — so the conditions behind power, investment, delivery and operations are clear before anyone commits.
Clear roles strengthen the plan. i3 Power & Energy maintains IDRP governance. Utilities, engineers, owners and operators keep their own authority.
See the six plans that build the IDRP ↓What must the project deliver, and under which conditions?
What supports the approach, and which assumptions remain open?
Who must review, approve and fulfill each commitment?
How does accepted capability carry into continuing performance?
The i3 IDRP Portal is where stakeholders engage with the work. Each role sees the evidence and decisions relevant to it — from the first load request to continuing operations.
WHAT EACH ROLE DOES IN THE PORTAL
UTILITIES
Evaluate growth against the actual system.
INVESTORS
Underwrite a consistent project basis.
TENANTS
Match demand to deliverable capacity.
DELIVERY PARTNERS
Build from an approved, coordinated scope.
OPERATORS
Carry project commitments into daily operations.
COMMUNITIES
Make relevant commitments visible and measurable.
THE JOURNEY · BUILD TO OPERATE
First, six connected plans build the evidence. Then five milestones carry that plan into investment, construction and operations. Each party keeps its own approvals.
Location, intended use, delivery points and infrastructure dependencies.
Demand, resources, phasing and provider service conditions.
Operating scenarios, analytical assumptions, outcomes and limitations.
Coordinated findings, responsibilities, open conditions and decisions.
Proposed import terms, resource response, flexibility and approvals.
Accepted duties, monitoring, response procedures and change review.
New findings can reopen earlier assumptions; controlled revisions preserve the accepted basis and its history.
Establish the project’s real starting point.
You leave with: an agreed basis for the next studies.
Test the plan before releasing commitments.
You leave with: a documented project basis with defined authorities.
Align funding and supply with approved readiness.
You leave with: authorized funding and procurement commitments.
Verify the capability the project promised.
You leave with: accepted capability and a documented handoff.
Stay accountable through the operating life.
You leave with: continuing service verification and Day Two support.
SOLUTIONS
Start with i3 IDRP governance and i3IQ decision intelligence. Then add standardized compute, resource management, local power and the Digital Architecture as your project needs them.
01 · Integrated Distributed Resource Plan
The IDRP connects infrastructure requirements, evidence, alternatives, responsibilities and decisions across the project lifecycle — a shared basis for aligning power, tenants, capital, delivery and operations.
THE PROBLEM
Separate studies and commitments leave teams working from different assumptions, without clear evidence, decision ownership or conditions for moving forward.
WHAT WE DO
Coordinate the six i3 Portfolio plans through one living decision record. i3 Power & Energy maintains IDRP integrity; each party keeps its approval authority.
THE RESULT
Engineering findings connect to investment gates, PPA economics and operating obligations — with traceable evidence and controlled revisions.
WHAT YOU GET
02 · AI decision intelligence
i3IQ connects questions to evidence, dependencies, analytical tools and responsible reviewers across electric, gas, water and telecom infrastructure.
THE PROBLEM
One infrastructure change can affect several networks, studies and commitments. Decision-makers need to see those dependencies and the evidence to resolve them.
WHAT WE DO
Begin with a question. i3IQ explains findings, compares assumptions and prepares evidence-linked briefs with open conditions and next review actions.
THE RESULT
Infrastructure implications become easier to investigate and explain — while approvals stay with the responsible parties.
WHAT YOU GET
03 · Standardized Distributed Compute Compact
The SDCC connects a data center’s load ramp to utility capacity, onsite generation, storage and approved flexibility — a repeatable framework, engineered for each location.
THE PROBLEM
Power availability, tenant timing, resilience and financing can advance on incompatible assumptions, delaying the commitments that bring capacity into service.
WHAT WE DO
Coordinate infrastructure qualification, operating scenarios, tenant requirements and investment gates through one IDRP, from planning through operations.
THE RESULT
A clearer path to service and contracted value through aligned capacity, energy supply, reliability and qualified flexibility.
WHAT YOU GET
04 · Distributed Energy Resource Management & Energy as a Service
DERM connects commercial and industrial loads, onsite resources, controls and operating limits. Energy as a Service adds continuing energy management and qualified demand response.
THE PROBLEM
Customer sites hold flexibility, but production needs, asset limits, inconsistent data and participation terms decide what can actually be delivered.
WHAT WE DO
Assess loads and equipment, set operating boundaries, qualify response, integrate controls and verify performance through one coordinated program.
THE RESULT
Customer cost management and useful utility response, with measurable delivery and explicit benefit allocation.
WHAT YOU GET
05 · Local generation & battery storage
Local generation and battery storage address defined capacity, operating or resilience needs at substations, feeder groups and distribution planning areas.
THE PROBLEM
A system constraint has a location and timing. Equipment nameplate capacity alone does not establish dependable service.
WHAT WE DO
Translate the utility need into a resource specification, study interconnection, set dispatch priorities and match accepted capability with an eligible buyer.
THE RESULT
Pathways to contracted capacity, energy, peak management and qualified grid services — with costs and obligations built into the commercial model.
WHAT YOU GET
06 · The connected infrastructure model
The i3 Digital Architecture is the governed foundation for infrastructure relationships, evidence, identity, permissions and analytical access across electric, gas, water and telecom.
THE PROBLEM
Disconnected systems describe the same asset or service condition differently, hiding source authority, timing and dependencies.
WHAT WE DO
Connect the top-down virtual grid with bottom-up project evidence through consistent identities, units, relationships, versions and permissions.
THE RESULT
A traceable infrastructure context for analysis and collaboration, with findings linked to their sources and the decisions they support.
WHAT YOU GET
Grid connected
Utility supply serves the facility within documented service conditions. Onsite resources, reserves and the tenant load ramp are coordinated with the accepted capacity schedule.
Bridge power
Where feasible, onsite resources can supply the site before the intended utility service is available. Fuel, resilience, permits, operating costs and transition requirements shape the arrangement.
Curtailment
Approved generation, storage and facility flexibility respond to a curtailment request while maintaining the agreed customer service. Duration, reserves, response time and costs are evaluated together.
Qualified export
Eligible generation or storage may serve an authorized utility or market counterparty when the site’s own obligations remain protected.
Bring capacity conditions, onsite options and the tenant load ramp into the same early assessment.
Reuse planning patterns, commercial exhibits and acceptance criteria while validating local constraints.
Sequence tenant commitments, funding and procurement against the approved operating plan.
PROOF
Want to learn more about projects in ?
Select a state on the map, or choose one below.
Thank you for your interest in learning more about i3 Infrastructure Partners. A team member will reach out shortly to discuss your project needs.
PARTNERS



LEADERSHIP
i3 Power & Energy





Alosanar



Wesco
THE COMPANY
i3 Infrastructure Partners is the commercial platform. i3 Energy Architecture, powered by i3 Power & Energy, supplies the i3 Digital Architecture, i3IQ and i3 IDRP governance. Delivery and operating partners bring the contracted capabilities to execute.
Commercial coordination, project and portfolio structures, and the partner ecosystem.
Supplies the i3 Digital Architecture, i3IQ and i3 IDRP governance.
Utility, capital, tenant, engineering, EPC, equipment and operating partners — connected by agreement, aligned by the IDRP.
WHAT WE COORDINATE FOR EVERY PROJECT
Infrastructure should create value beyond its fence. We collaborate with i3 Foundation partners, communities and research participants.See our community model and the i3 Research Foundation →
Become an ecosystem partnerGET STARTED
An infrastructure question. A capacity constraint. An investment decision. Begin with what you know — build a short brief to share with your i3 team.
info@i3powerenergy.com · 8115 Judith Ln Unit #2007, Mechanicsville, VA 23116
BUILD YOUR BRIEF IN 3 STEPS