The headlines say new power is years away. Our team identifies verified, available capacity — reserved at the substation, with gas, water and fiber coordinated by one team. And every project gives back to the community that hosts it.
Power scarcity is the defining issue of the AI era.
Tenants are ready to sign, but new capacity waits years for a connection. Sites with real, near-term power win.
Vacancy in primary markets
1.4%
To get grid power
2–6 yrs
Waiting to connect
2,061 GW
Of US power by 2028
Up to 12%
DEMAND IS SURGING
US data center demand grows from ~25 GW (2024) to 80+ GW (2030). Over 80% of capacity under construction is already preleased.
SUPPLY LOOKS STUCK
PJM: 6.6 GW short, a first
Up to 7 years for 100 MW in Virginia
Transformers: 2–4 year lead times
ERCOT: about 410 GW load queue
THE RESULT
Tenants can’t find power
More moratoriums and pushback
Sites with near-term power win
The other side of the story:power is much more available than the headlines indicate.
Most headlines track crowded metro markets. Look across the country, including rural America, and there is verified capacity with room for real data center load. Those communities often welcome the jobs and tax base a project brings.
Illustrative map. Does not show actual sites or service boundaries.
Sources: CBRE North America Data Center Trends H1 2026; WRI 2025; LBNL Queued Up 2026 Edition; DOE/LBNL 2024; McKinsey 2024; PJM 2025 capacity auction; Dominion Energy; PwC 2026; ERCOT 2026.
ALL UTILITIES, ONE SITE
Power starts a project. Every utility finishes it.
Gas, water and telecom fiber are as critical as power. Any one of them missing or late can stall a project. We coordinate all of them together, at the site level, before you commit.
Power
The core constraint. Without confirmed MW and timing, nothing else moves.
We confirm: substation-level MW, timing and utilization
Gas
Feeds on-site generation, backup and bridge power while grid capacity ramps.
We confirm: gas service and infrastructure at the site
Water
Cooling and fire protection depend on reliable supply and permits.
We confirm: supply, capacity and closed-loop design
Telecom fiber
Compute needs low-latency, diverse fiber routes to reach customers.
We confirm: fiber routes and carrier access
Built in at every site: three attributes that lower risk
GRID-READY
Curtailment-ready
Sites are designed to curtail grid draw when the utility needs it, with a full on-site power and backup solution.
Why it matters: utilities can say yes to large loads faster.
COST CERTAINTY
No peak demand charges
Power is structured with the utility, including a power purchase agreement (PPA), so sites carry no peak demand charges.
Why it matters: predictable operating cost for the life of the lease.
COMMUNITY FIRST
Outside moratorium areas
Power can be routed outside moratorium areas to respect local communities.
Why it matters: fewer approval risks and no fights with neighbors.
THE PROGRAM · THREE STEPS
Reserve utilities. Secure sites. Execute the lease.
Capacity is confirmed and planned with utility partners first. You then reserve known capacity, and each commitment advances only when the agreed conditions for that stage are met.
STEP 1 · Utility Power Reservation Agreement
Reserve all utilities
Save years in planning and studies. Secure power, gas, water and telecom in one step.
✓Substation-level MW, timing and utilization
✓Gas, water and telecom infrastructure included
✓PPA with the utility
✓No demand charges
✓Full on-site curtailment and backup
✓Routed outside moratorium areas
YOUR STEP
Sign the agreement and pay the reservation fee. Define reserved MW and timing.
CONDITIONS TO PROCEED
If qualifying sites do not follow by the deadline, agreed power exit rights apply.
STEP 2 · Sites Exclusivity Letter of Intent
Secure the sites
More than powered land. Site selection that maximizes MW density per site and per acre.
✓Utility characteristics confirmed at each site
✓Power, gas and water confirmed
✓Higher MW density per site and per acre
✓Preselected sites matched to reserved MW
YOUR STEP
Sign exclusivity for enough sites to match reserved MW. Agree a right of first refusal on site power expansion.
CONDITIONS TO PROCEED
If the data center lease does not follow by the deadline, agreed site and power exit rights apply.
STEP 3 · Definitive Data Center Lease
Execute the lease
A pre-contracted value chain and modular solutions for faster delivery.
✓Data center supply-chain resources aligned
✓Ready-for-service dates set
✓Agreed lease commercial terms
✓Defined delivery requirements
YOUR STEP
Sign the data center lease on agreed commercials.
CONDITIONS TO PROCEED
Agreed delivery conditions and exit rights apply.
Commitments advance only when agreed stage conditions are met. Exit rights, fees, refunds and expansion rights are expressly documented in each agreement, including with the utility.
THE SCALE
Sites average 30 MW. The program can reach 1 GW.
Average site
30 MW
One pad-ready site, matched to your reserved MW.
Average project area
~360 MW
About 12 sites around multiple substations.
Growth strategy
Up to 1 GW
Scalable across project areas.
Each block is 30 MW, drawn to scale. Site and project-area figures are averages, and cumulative capacity varies by project.
PAD-READY SITES
More than powered land. Ready to design and build.
Every utility and site factor is confirmed before you commit, so you move straight to design and construction.
Illustrative parcel · power, gas, water and fiber confirmed before you commit
Land and zoning
✓ Secured
Substation power
✓ Confirmed MW and timing
Gas service
✓ Confirmed
Water supply
✓ Confirmed
Telecom fiber
✓ Confirmed
Curtailment
✓ Ready, no peak demand charges
Site layout
✓ Planned for MW density per acre
Fit to your load
✓ Matched to reserved MW
FROM PAD-READY TO LEASED
1 · THE SITE
Pad-ready site
Utilities confirmed, layout planned, sites matched to reserved MW.
2 · WE BUILD AND FINANCE
Full grey space buildout
Shell, power distribution, cooling plant and on-site backup — designed, built and financed through our ecosystem.
3 · YOU LEASE
White space, ready to fit out
Bring your IT, with flexible terms from powered shell to turnkey. Your capital goes to compute.
HOW WE DELIVER
One team for the entire value chain.
Grey space only matters if it’s delivered on schedule. Our Ecosystem Partners are already selected, with a broader ecosystem behind them that manages scarcity and matches specialists to every site.
01
Engineering
Design, MEP and structure for heavy AI racks
02
Power & energy
Substation, on-site generation and battery storage
03
Construction
Modular builds at multiple sites at once
04
Equipment
Long-lead gear secured early
05
Commissioning
Tested and verified to hyperscale standards
06
Operations
Critical facilities O&M and command center
Pre-contracted value chain
Modular, repeatable delivery
Ready-for-service dates set in the lease
One point of accountability, from the utility to Day Two operations
LEASE STRUCTURES SHAPED AROUND HOW YOU BUY
Powered shell
Turnkey
Smart hands
Tenant JV
Purchase option
Shared revenue
BUILT ON THE i3 PLATFORM
Every commitment, visible before you sign.
Every site becomes a connected model first. The i3 Digital Architecture brings each constraint into one view, i3IQ explains the implications, and the i3 IDRP keeps each condition and decision on the record.
New data center demand often means higher rates. Our model flips that equation: every project is designed both to stabilize rates and to give back to the community — which helps your project win local support.