← OverviewOne plan · one platform · one team

FOR TENANTS · DATA CENTER OWNERS · OPERATORS

Power for AI. Available now.

The headlines say new power is years away. Our team identifies verified, available capacity — reserved at the substation, with gas, water and fiber coordinated by one team. And every project gives back to the community that hosts it.

Reservable, from 300 MW
Up to 1 GW
Average pad-ready site
30 MW
Utilities: power, gas, water, fiber
4
Peak demand charges
$0

THE CHALLENGE

Power scarcity is the defining issue of the AI era.

Tenants are ready to sign, but new capacity waits years for a connection. Sites with real, near-term power win.

Vacancy in primary markets
1.4%
To get grid power
2–6 yrs
Waiting to connect
2,061 GW
Of US power by 2028
Up to 12%

DEMAND IS SURGING

US data center demand grows from ~25 GW (2024) to 80+ GW (2030). Over 80% of capacity under construction is already preleased.

SUPPLY LOOKS STUCK

  • PJM: 6.6 GW short, a first
  • Up to 7 years for 100 MW in Virginia
  • Transformers: 2–4 year lead times
  • ERCOT: about 410 GW load queue

THE RESULT

  • Tenants can’t find power
  • More moratoriums and pushback
  • Sites with near-term power win

The other side of the story:power is much more available than the headlines indicate.

Most headlines track crowded metro markets. Look across the country, including rural America, and there is verified capacity with room for real data center load. Those communities often welcome the jobs and tax base a project brings.

Illustrative map of the United States
Illustrative map. Does not show actual sites or service boundaries.

Sources: CBRE North America Data Center Trends H1 2026; WRI 2025; LBNL Queued Up 2026 Edition; DOE/LBNL 2024; McKinsey 2024; PJM 2025 capacity auction; Dominion Energy; PwC 2026; ERCOT 2026.

ALL UTILITIES, ONE SITE

Power starts a project. Every utility finishes it.

Gas, water and telecom fiber are as critical as power. Any one of them missing or late can stall a project. We coordinate all of them together, at the site level, before you commit.

Power

The core constraint. Without confirmed MW and timing, nothing else moves.

We confirm: substation-level MW, timing and utilization

Gas

Feeds on-site generation, backup and bridge power while grid capacity ramps.

We confirm: gas service and infrastructure at the site

Water

Cooling and fire protection depend on reliable supply and permits.

We confirm: supply, capacity and closed-loop design

Telecom fiber

Compute needs low-latency, diverse fiber routes to reach customers.

We confirm: fiber routes and carrier access

Built in at every site: three attributes that lower risk

GRID-READY

Curtailment-ready

Sites are designed to curtail grid draw when the utility needs it, with a full on-site power and backup solution.

Why it matters: utilities can say yes to large loads faster.

COST CERTAINTY

No peak demand charges

Power is structured with the utility, including a power purchase agreement (PPA), so sites carry no peak demand charges.

Why it matters: predictable operating cost for the life of the lease.

COMMUNITY FIRST

Outside moratorium areas

Power can be routed outside moratorium areas to respect local communities.

Why it matters: fewer approval risks and no fights with neighbors.

THE PROGRAM · THREE STEPS

Reserve utilities. Secure sites. Execute the lease.

Capacity is confirmed and planned with utility partners first. You then reserve known capacity, and each commitment advances only when the agreed conditions for that stage are met.

STEP 1 · Utility Power Reservation Agreement

Reserve all utilities

Save years in planning and studies. Secure power, gas, water and telecom in one step.

  • Substation-level MW, timing and utilization
  • Gas, water and telecom infrastructure included
  • PPA with the utility
  • No demand charges
  • Full on-site curtailment and backup
  • Routed outside moratorium areas

YOUR STEP

Sign the agreement and pay the reservation fee. Define reserved MW and timing.

CONDITIONS TO PROCEED

If qualifying sites do not follow by the deadline, agreed power exit rights apply.

Commitments advance only when agreed stage conditions are met. Exit rights, fees, refunds and expansion rights are expressly documented in each agreement, including with the utility.

THE SCALE

Sites average 30 MW. The program can reach 1 GW.

Average project area

~360 MW

About 12 sites around multiple substations.

Each block is 30 MW, drawn to scale. Site and project-area figures are averages, and cumulative capacity varies by project.

PAD-READY SITES

More than powered land. Ready to design and build.

Every utility and site factor is confirmed before you commit, so you move straight to design and construction.

Aerial view of a rural parcel outlined in gold
Illustrative parcel · power, gas, water and fiber confirmed before you commit
Land and zoning
✓ Secured
Substation power
✓ Confirmed MW and timing
Gas service
✓ Confirmed
Water supply
✓ Confirmed
Telecom fiber
✓ Confirmed
Curtailment
✓ Ready, no peak demand charges
Site layout
✓ Planned for MW density per acre
Fit to your load
✓ Matched to reserved MW

FROM PAD-READY TO LEASED

1 · THE SITE

Pad-ready site

Utilities confirmed, layout planned, sites matched to reserved MW.

2 · WE BUILD AND FINANCE

Full grey space buildout

Shell, power distribution, cooling plant and on-site backup — designed, built and financed through our ecosystem.

3 · YOU LEASE

White space, ready to fit out

Bring your IT, with flexible terms from powered shell to turnkey. Your capital goes to compute.

HOW WE DELIVER

One team for the entire value chain.

Grey space only matters if it’s delivered on schedule. Our Ecosystem Partners are already selected, with a broader ecosystem behind them that manages scarcity and matches specialists to every site.

  1. 01

    Engineering

    Design, MEP and structure for heavy AI racks

  2. 02

    Power & energy

    Substation, on-site generation and battery storage

  3. 03

    Construction

    Modular builds at multiple sites at once

  4. 04

    Equipment

    Long-lead gear secured early

  5. 05

    Commissioning

    Tested and verified to hyperscale standards

  6. 06

    Operations

    Critical facilities O&M and command center

  • Pre-contracted value chain
  • Modular, repeatable delivery
  • Ready-for-service dates set in the lease
  • One point of accountability, from the utility to Day Two operations

LEASE STRUCTURES SHAPED AROUND HOW YOU BUY

  • Powered shell
  • Turnkey
  • Smart hands
  • Tenant JV
  • Purchase option
  • Shared revenue

BUILT ON THE i3 PLATFORM

Every commitment, visible before you sign.

Every site becomes a connected model first. The i3 Digital Architecture brings each constraint into one view, i3IQ explains the implications, and the i3 IDRP keeps each condition and decision on the record.

See how the platform works →

CONNECT

i3 Digital Architecture

EVALUATE

i3IQ

GOVERN

i3 IDRP

ENGAGE

i3 IDRP Portal

EMPOWERING COMMUNITIES

Data centers that stabilize energy rates.

New data center demand often means higher rates. Our model flips that equation: every project is designed both to stabilize rates and to give back to the community — which helps your project win local support.

Aerial view of a tree-lined residential neighborhood

Project-funded infrastructure

Members don’t pay for project upgrades.

Rate stability

New load designed to ease pressure on rates.

Home savings

Efficiency upgrades for low-income homes.

Environment

Sited away from homes, with closed-loop cooling.

See the full community model →

Ready to reserve capacity?

Tell us your load, timing and locations. Your brief goes to your i3 team.