FOR UTILITIES · CO-OPS · MUNICIPALS · INVESTOR-OWNED · G&Ts
Evaluate growth against the actual system.
Make each load request part of a system plan — and turn new data center demand into rate stability and community benefit, while you keep decision authority.
YOU KEEP AUTHORITY
Every approval stays with the utility.
PROJECT-FUNDED
Members don’t pay for project upgrades.
CURTAILMENT-READY
Say yes to large loads faster.
WHAT YOU GET
One coordinated view of every load request.
Review proposed loads, infrastructure conditions and approval dependencies together — not request by request.
THE DECISION YOU’LL MAKE
Which capacity and operating conditions can advance, what evidence is still needed, and which utility approvals govern the next commitment.
- Capacity assessment and service conditions
- Curtailment envelope and resource response
- Outstanding studies and approval dependencies
- Project-funded infrastructure, structured with a PPA
A SHARED PARTNERSHIP PATH
Four steps. Your approvals at every one.
The i3 IDRP keeps the request, the evidence and the decisions in one living record. Select a step.
STEP 1
Utility intake
Share the load requests you’re evaluating, your service territory and known constraints. Each request becomes part of a system plan instead of a one-off study.
WHO DECIDES
The utility
STEP 2
IDRP evaluation & approvals
Proposed loads, infrastructure conditions and approval dependencies are reviewed in one coordinated view, with evidence, open conditions and alternatives on the record.
WHO DECIDES
The utility and authorized infrastructure providers
STEP 3
Coordinated commitments
Capacity, the curtailment envelope and service conditions advance together with tenant, capital and delivery commitments — never ahead of your approvals.
WHO DECIDES
The utility, contracting counterparties and project decision owners
STEP 4
Operating evidence
Metered performance and operating evidence support service verification, reporting and controlled change for the life of the project.
WHO DECIDES
The utility, asset owners and contracted operators
HOW WE WORK WITH YOUR TEAM
Embedded with your planners. Mapped site by site.
Our team includes former utility executives. We work alongside your capacity planning and run land analysis to find sites that line up with your substations and every utility a data center needs.
- 1 · INSIDE THE UTILITY
Embedded in capacity planning
We work alongside your planners, so substation-level MW, timing and utilization are understood as they are planned.
- 2 · ACROSS SUBSTATIONS
Extensive land analysis
We map land around multiple substations at once and correlate each parcel to the capacity it can actually draw.
- 3 · EVERY UTILITY, EVERY SITE
Screened for all utilities
Each candidate is checked for gas, water, telecom fiber, zoning and local moratoriums. Only parcels that pass everything move forward.
GRID-READY
Curtailment-ready sites
Designed to curtail grid draw when you need it, with full on-site power and backup.
STAGED
Staged power delivery
More MW at each stage, matched to what your system can serve.
ONSITE RESOURCES
Batteries, microgrids, bridge power
Resources that support the site while grid capacity ramps.
COMMERCIAL
PPA with the utility
Power structured with you, so the commercial terms are clear from the start.
THE COMMUNITY MODEL
Data centers that stabilize energy rates.
New data center demand often means higher rates. Our model flips that equation: we connect new demand to rate stability, home efficiency, environmental care and local reinvestment.

Project-funded
The project pays for its infrastructure.
The developer funds project-specific utility infrastructure, protecting members from those development costs while creating broader community value.
- Developer-funded utility infrastructure
- Planned tax revenue
- Local jobs and opportunities for local businesses
Rate stability
Turn new demand into member benefit.
New demand can put upward pressure on rates. Our model is designed to reverse that dynamic; planning indicates rates can remain stable for substantially longer because of these types of projects.
- Developer-funded infrastructure
- New revenue for the nonprofit, member-owned cooperative
- Designed to ease pressure on rates
Home savings
Stable rates. Less energy. Lower bills.
Rate support is only the start. Capital-credit payments received by the project go toward efficiency upgrades that reduce energy use for participating families.
- All co-op capital credits contractually dedicated
- Supports the i3 Research Foundation
- Upgrades for low-income, single-family homes
Environment
Purposefully located. Carefully designed.
Sites are selected away from homes and designed with residential-level care, using sound studies and closed-loop cooling to limit noise and water use.
- Noise targeted at or below typical offices
- Closed-loop cooling recirculates water
- Water use targeted at or below conventional facilities
THE i3 RESEARCH FOUNDATION · PROPOSED
Stronger grids. Thriving communities.
Envisioned as an independent, cooperative-led research and education organization. Every cooperative can benefit; a cooperative does not need to host a data center to use the research.
SOLUTIONS FOR UTILITIES
Infrastructure that earns its place on your system.
LOCAL POWER
Place dispatchable resources where the system needs them.
Local generation and battery storage address defined capacity, operating or resilience needs at substations, feeder groups and planning areas.
DERM & ENERGY AS A SERVICE
Turn customer flexibility into a dependable service.
Distributed Energy Resource Management connects commercial and industrial loads, onsite resources and controls — with measured, verified response.
THE CONNECTED VIRTUAL GRID
See every request against your actual system.
The i3 Digital Architecture follows supply from transmission through substations, feeders and meters to site assets and loads.
See the platform →Bring your next load request. We’ll bring the whole plan.
Tell us about your system and the requests you’re evaluating. Your brief goes to your i3 team.